Sleepers, initially hewn and then sawn, from our public native forests have been a critical component in building the Colony's and then the State's infrastructure. Figures for the annual numbers, or volumes, of sleepers taken from Victoria's native forests were first recorded in 1910/1911 and the statistics link on this page shows the number recorded in the following financial years (except 1918/1919) until 1985/86.

These sleepers came primarily from our red gum forests in the first instance, but as time went on they also came from extensive harvesting in the Mullundung Forest for Yellow Stringybark sleepers, and the East Gippsland Forests. 

Simply put, the figures are astounding. For example, production peaked at 919509 sleepers in 1933/34, and over the total period examined the State's forests produced about 26,680,000 sleepers - more than 26 million.

Making assumptions shown in the table about sleeper dimensions and spacing when in use, this number of sleepers could have helped construct something more than 20000 km of rail line. Now, of course many will have be used for rmaintenance purposes, but the extent of the contribution becomes very clear when viewed this way.

 
vfh0130ed.jpg

Cutting red gum sleepers at Gunbower with a barrow saw. Facing (from left): J Newey, S Ryan, ? , L Newman, A Hodgson, B Evans, A Eddy, A Sebire, H Kosmer, R Incoll
1959
Photo: B Fry

 

vfh0602ed.jpg

Sleepers cutters with the tools of their trade
Probably about 1908-1909
(Source: Stephen Watson - Moe Walhalla Railway Museum Collection, Erica)

 
vfh0601ed.jpg

200 sleepers awaiting collection on the Walhalla Railway
Probably about 1908-1909
(Source: Stephen Watson - Moe Walhalla Railway Museum Collection, Erica)

 
vfh0603ed.jpg

Locomotive 1A collecting sleepers on the Walhalla Railway
Probably about 1908-1909
(Source: Stephen Watson - Moe Walhalla Railway Museum Collection, Erica)